{"id":1887,"date":"2025-12-11T08:16:37","date_gmt":"2025-12-11T08:16:37","guid":{"rendered":"https:\/\/www.mecatelier.com\/automated-painting-lines\/"},"modified":"2026-11-10T19:44:08","modified_gmt":"2026-11-10T19:44:08","slug":"automated-painting-lines","status":"publish","type":"page","link":"https:\/\/www.mecatelier.com\/en\/automated-painting-lines\/","title":{"rendered":"Automated Painting Lines"},"content":{"rendered":"\n<section class=\"mecv3-hero\" style=\"--mecv3-photo:url('\/wp-content\/uploads\/2026\/08\/ligne-traitement-compartiments-mecatelier-scaled.jpg')\">\n  <img class=\"mecv3-hero-img\" src=\"\/wp-content\/uploads\/2026\/08\/ligne-traitement-compartiments-mecatelier-1024x768.jpg\" srcset=\"\/wp-content\/uploads\/2026\/08\/ligne-traitement-compartiments-mecatelier-scaled.jpg 2560w, \/wp-content\/uploads\/2026\/08\/ligne-traitement-compartiments-mecatelier-300x225.jpg 300w, \/wp-content\/uploads\/2026\/08\/ligne-traitement-compartiments-mecatelier-1024x768.jpg 1024w, \/wp-content\/uploads\/2026\/08\/ligne-traitement-compartiments-mecatelier-768x576.jpg 768w, \/wp-content\/uploads\/2026\/08\/ligne-traitement-compartiments-mecatelier-1536x1152.jpg 1536w, \/wp-content\/uploads\/2026\/08\/ligne-traitement-compartiments-mecatelier-2048x1536.jpg 2048w\" sizes=\"(max-width:980px) 100vw, 62vw\" alt=\"Inside a Mecatelier treatment line: grating floor over the whole area, vertical lighting columns bearing the Ex marking, yellow covers on the floor along the traffic aisle and a sectional door open onto the next compartment\" width=\"2560\" height=\"1920\" fetchpriority=\"high\" decoding=\"async\"\/>\n  <div class=\"mecv3-hero-content\">\n    <div class=\"mecv3-copy\">\n      <div class=\"mecv3-eyebrow\">Complete installations \u00b7 custom study<\/div>\n      <h1 class=\"mecv3-h1\">Automated painting lines<\/h1>\n      <p class=\"mecv3-lead\">When one booth is no longer enough, it is the part that has to move along \u2014 not the operator running from one station to the next.<\/p>\n      <div class=\"mecv3-actions\">\n        <a class=\"mecv3-btn mecv3-btn--primary\" href=\"https:\/\/www.mecatelier.com\/en\/contact-us\/\">Request a study<\/a>\n        <a class=\"mecv3-btn mecv3-btn--secondary\" href=\"https:\/\/www.mecatelier.com\/en\/projects\/\">See our projects<\/a>\n      <\/div>\n      <div class=\"mecv3-badges\">\n        <span class=\"mecv3-badge\"><span class=\"mecv3-dot\">\u2192<\/span>Stations in sequence<\/span>\n        <span class=\"mecv3-badge\"><span class=\"mecv3-dot\">\u2713<\/span>Design and manufacture<\/span>\n        <span class=\"mecv3-badge\"><span class=\"mecv3-dot mecv3-dot--cle\"><svg viewbox=\"0 0 24 24\" fill=\"none\" stroke=\"currentColor\" stroke-width=\"1.9\" stroke-linecap=\"round\" stroke-linejoin=\"round\" aria-hidden=\"true\"><circle cx=\"7.5\" cy=\"12\" r=\"3.6\"><\/circle><path d=\"M11.1 12H21\"><\/path><path d=\"M17.6 12v3.1\"><\/path><path d=\"M20.4 12v2.2\"><\/path><\/svg><\/span>Custom-built<\/span>\n      <\/div>\n    <\/div>\n  <\/div>\n<\/section>\n\n<div class=\"mecv3-statsband\">\n  <div class=\"mecv3-statsband__inner\">\n    <div class=\"mecv3-stat\"><span class=\"mecv3-stat__ico\"><svg viewbox=\"0 0 24 24\" fill=\"none\" stroke=\"currentColor\" stroke-width=\"1.5\" stroke-linecap=\"round\" stroke-linejoin=\"round\" aria-hidden=\"true\"><circle cx=\"12\" cy=\"12\" r=\"8.2\"><\/circle><circle cx=\"12\" cy=\"12\" r=\"4.3\"><\/circle><circle cx=\"12\" cy=\"12\" r=\"1.1\"><\/circle><\/svg><\/span><span class=\"mecv3-stat__txt\"><span class=\"mecv3-num\">100%<\/span><span class=\"mecv3-lbl\">Designed around your process<\/span><\/span><\/div>\n    <div class=\"mecv3-stat\"><span class=\"mecv3-stat__ico\"><svg viewbox=\"0 0 24 24\" fill=\"none\" stroke=\"currentColor\" stroke-width=\"1.5\" stroke-linecap=\"round\" stroke-linejoin=\"round\" aria-hidden=\"true\"><circle cx=\"12\" cy=\"9\" r=\"5.2\"><\/circle><path d=\"M8.8 13.4L7.4 21l4.6-2.6L16.6 21l-1.4-7.6\"><\/path><\/svg><\/span><span class=\"mecv3-stat__txt\"><span class=\"mecv3-num\">10+<\/span><span class=\"mecv3-lbl\">Years in business<\/span><\/span><\/div>\n    <div class=\"mecv3-stat\"><span class=\"mecv3-stat__ico\"><svg viewbox=\"0 0 24 24\" fill=\"none\" stroke=\"currentColor\" stroke-width=\"1.5\" stroke-linecap=\"round\" stroke-linejoin=\"round\" aria-hidden=\"true\"><path d=\"M3 21h18\"><\/path><path d=\"M5 21V11l5 3V11l5 3V7l4 2.5V21\"><\/path><path d=\"M8 17h1M13 17h1M18 17h1\"><\/path><\/svg><\/span><span class=\"mecv3-stat__txt\"><span class=\"mecv3-num\">360+<\/span><span class=\"mecv3-lbl\">Installations<\/span><\/span><\/div>\n    <div class=\"mecv3-stat\"><span class=\"mecv3-stat__ico\"><svg viewbox=\"0 0 24 24\" fill=\"none\" stroke=\"currentColor\" stroke-width=\"1.5\" stroke-linecap=\"round\" stroke-linejoin=\"round\" aria-hidden=\"true\"><path d=\"M3 21V9.5l5.5-3.5V21\"><\/path><path d=\"M8.5 21V12l6-3v12\"><\/path><path d=\"M14.5 21V11l6 3.2V21\"><\/path><path d=\"M2 21h20\"><\/path><\/svg><\/span><span class=\"mecv3-stat__txt\"><span class=\"mecv3-num\">7+<\/span><span class=\"mecv3-lbl\">Countries served<\/span><\/span><\/div>\n  <\/div>\n<\/div>\n\n<div class=\"mec-2026\">\n<div class=\"mec-bande gb-element-ce19926e\">\n<div class=\"gbp-section__inner\">\n<div class=\"gb-element-bb8b215b\">\n<div>\n<p class=\"gb-text gbp-section__text gb-text-6509ceca\">A booth handles one part at a time, and the workshop is organised around it. Beyond a certain volume, that no longer works: the booth becomes the bottleneck, and every operation before or after it waits its turn.<\/p>\n\n\n<p class=\"gb-text gbp-section__text gb-text-d89bda0c\">A line turns the reasoning around. Each step has its own <strong>dedicated station<\/strong> \u2014 preparation, application, curing \u2014 and the part moves from one to the next. While one part is drying, the next one is already being painted.<\/p>\n\n\n<div class=\"gb-element-9e2783a3\">\n<a class=\"gb-text gbp-button--primary gb-text-0a02310a\" href=\"\/en\/contact-us\/\">Request a study<\/a>\n\n\n<a class=\"gb-text gbp-button--secondary gb-text-2f09fd82\" href=\"\/en\/contact-us\/\">Contact us<\/a>\n\n<\/div>\n\n<\/div>\n\n<\/div>\n\n<\/div>\n\n<\/div>\n\n\n<section class=\"mecp-sec\">\n  <div class=\"mecp-sec__in\">\n    <div class=\"mecp-sec__grid\">\n      <div class=\"mecp-sec__aside\">\n      <span class=\"mecp-sec__num\">01<\/span>\n      <h2>Compartments one after another<\/h2>\n      <p class=\"mecp-verdict\">The principle of a line fits in one sentence: successive enclosures, isolated from one another, that the part passes through in the order of the process.<\/p>\n      <\/div>\n      <div>\n        <div class=\"mecp-prose\">\n          <p>Isolation matters as much as sequence. A door between two compartments stops sanding dust from settling on the fresh paint in the next station, and lets each enclosure have its own temperature and its own ventilation.<\/p>\n        <\/div>\n        <div class=\"mecp-benefits\">\n          <div class=\"mecp-ben\">\n            <h3>Each station has its function<\/h3>\n            <p>the same enclosure is not asked to remove dust, apply and cure<\/p>\n          <\/div>\n          <div class=\"mecp-ben\">\n            <h3>Each station has its own conditions<\/h3>\n            <p>temperature, airflow and filtration set for what happens there, not for an average<\/p>\n          <\/div>\n          <div class=\"mecp-ben\">\n            <h3>Each station has its own controls<\/h3>\n            <p>the operator runs their compartment without depending on the station next door<\/p>\n          <\/div>\n          <div class=\"mecp-ben\">\n            <h3>The doors really separate<\/h3>\n            <p>without them, a line is just one big booth with the defects of every step put together<\/p>\n          <\/div>\n        <\/div>\n      <\/div>\n    <\/div>\n  <\/div>\n<\/section>\n\n\n<div class=\"mecp-gal\">\n  <figure class=\"mecp-gal__big\">\n    <img src=\"\/wp-content\/uploads\/2026\/08\/ligne-traitement-compartiments-mecatelier-scaled.jpg\" alt=\"Inside a Mecatelier treatment line: grating floor, vertical Ex-marked lighting columns, yellow covers on the floor, hose reels hanging from a rail and a sectional door open onto the next compartment\" loading=\"lazy\" decoding=\"async\"\/>\n    <figcaption>The door at the back is open onto the next compartment: you can see the line continuing. The floor is grating over the whole area, and the lighting is vertical and Ex-marked.<\/figcaption>\n  <\/figure>\n  <div class=\"mecp-gal__col\">\n    <figure>\n      <img src=\"\/wp-content\/uploads\/2026\/08\/ligne-traitement-montage-mezzanine-scaled.jpg\" alt=\"Mecatelier treatment line during installation: open curing oven showing a part inside, adjoining booth in white panels and steel mezzanine carrying the air handling units\" loading=\"lazy\" decoding=\"async\"\/>\n      <figcaption>During installation. The air handling units sit on a mezzanine above the line: they take up no floor space.<\/figcaption>\n    <\/figure>\n  <\/div>\n<\/div>\n\n\n<section class=\"mecp-sec mecp-sec--tint\">\n  <div class=\"mecp-sec__in\">\n    <div class=\"mecp-sec__grid\">\n      <div class=\"mecp-sec__aside\">\n      <span class=\"mecp-sec__num\">02<\/span>\n      <h2>What gets settled before the first panel<\/h2>\n      <p class=\"mecp-verdict\">A line is designed from the process, never the other way round. Three questions govern everything else, and they come before any talk of equipment.<\/p>\n      <\/div>\n      <div>\n        <div class=\"mecp-benefits\">\n          <div class=\"mecp-ben\">\n            <h3>What do you treat, and in what order?<\/h3>\n            <p>the sequence of stations is a copy of your process routing<\/p>\n          <\/div>\n          <div class=\"mecp-ben\">\n            <h3>How many parts, and at what rate?<\/h3>\n            <p>it is the throughput that sizes each station, and it is the slowest station that sets the output of the whole line<\/p>\n          <\/div>\n          <div class=\"mecp-ben\">\n            <h3>How much space do you really have?<\/h3>\n            <p>height under the trusses, column spacing, position of the doors: a line adapts to the building, not the other way round<\/p>\n          <\/div>\n        <\/div>\n      <\/div>\n    <\/div>\n  <\/div>\n<\/section>\n\n\n<section class=\"mecp-sec\">\n  <div class=\"mecp-sec__in\">\n    <div class=\"mecp-sec__grid\">\n      <div class=\"mecp-sec__aside\">\n      <span class=\"mecp-sec__num\">03<\/span>\n      <h2>Air, heating and floor space<\/h2>\n      <p class=\"mecp-verdict\">A line uses a lot of air, and that air has to be renewed, filtered and sometimes heated. The air handling units that do this are bulky.<\/p>\n      <\/div>\n      <div>\n        <div class=\"mecp-prose\">\n          <p>Putting them on the floor would mean sacrificing the workshop space the line was supposed to free up. So we install them on a <strong>mezzanine above the line<\/strong>, with the ducts coming down to each compartment. The floor space stays available for production.<\/p>\n          <p>That is also what makes maintenance practical: the units and filters can be reached without stopping what is going on below.<\/p>\n        <\/div>\n      <\/div>\n    <\/div>\n  <\/div>\n<\/section>\n\n\n<section class=\"mecp-sec mecp-sec--tint\">\n  <div class=\"mecp-sec__in\">\n    <div class=\"mecp-sec__grid\">\n      <div class=\"mecp-sec__aside\">\n      <span class=\"mecp-sec__num\">04<\/span>\n      <h2>We design and we build<\/h2>\n      <p class=\"mecp-verdict\">The enclosures, walls, doors, ventilation and control cabinets come out of our workshop. This is not a point of pride: it is what lets us design a compartment to the exact size of your parts rather than fitting your needs to a catalogue.<\/p>\n      <\/div>\n      <div>\n        <div class=\"mecp-prose\">\n          <p>That is also what makes after-sales service possible. When a part has to be replaced ten years later, it is made again \u2014 not searched for in the stock of a supplier who has changed its range.<\/p>\n        <\/div>\n        <div class=\"mecp-sec__actions\">\n          <a class=\"mecv3-btn mecv3-btn--primary\" href=\"\/en\/contact-us\/\">Request a study<\/a>\n        <\/div>\n      <\/div>\n    <\/div>\n  <\/div>\n<\/section>\n\n\n<section class=\"mecp-sec mecp-sec--tint\">\n  <div class=\"mecp-sec__in\">\n    <div class=\"mecp-sec__grid\">\n      <div class=\"mecp-sec__aside\">\n      <span class=\"mecp-sec__num\">FAQ<\/span>\n      <h2>Frequently asked questions<\/h2>\n      <p class=\"mecp-verdict\">What people ask us before starting a line study.<\/p>\n      <\/div>\n      <div>\n          <details class=\"mecp-faq\" open=\"\">\n            <summary>From what volume is a line worthwhile?<\/summary>\n            <p>There is no universal threshold, and be wary of anyone who gives you one. The real signal lies elsewhere: if your booth spends a large share of its time drying or waiting rather than painting, the capacity you have already paid for is tied up. It is this imbalance, not a number of parts, that makes a line pay off.<\/p>\n          <\/details>\n          <details class=\"mecp-faq\">\n            <summary>Does everything have to be automated?<\/summary>\n            <p>No, and it is rarely the right calculation. A line can be fully manual for application and automate only the transfer between stations \u2014 which already solves handling and waiting. Automating application is only justified on repetitive runs, where the movement is always the same.<\/p>\n          <\/details>\n          <details class=\"mecp-faq\">\n            <summary>Can a line be installed in an existing building?<\/summary>\n            <p>That is the most common case. The building survey therefore comes early in the study: available height, column spacing, position of the doors and supply connections. These constraints shape the line as much as the process does, and it is better to know them before drawing than to discover that a column falls in the middle of a compartment.<\/p>\n          <\/details>\n          <details class=\"mecp-faq\">\n            <summary>Can we start small and add to it later?<\/summary>\n            <p>Yes, provided it is planned from the study stage. Reserving the space for a future station, sizing the ventilation and supply connections for the complete line, and keeping access clear: this costs little at the start and avoids redoing everything. Adding a compartment to a line that did not plan for it often costs more than the complete original line.<\/p>\n          <\/details>\n          <details class=\"mecp-faq\">\n            <summary>Who handles the installation?<\/summary>\n            <p>Our teams. They install our equipment and also dismantle other manufacturers&#8217; installations, which is a good way to learn what ages badly. See the installation and dismantling page.<\/p>\n          <\/details>\n          <details class=\"mecp-faq\">\n            <summary>What does a line cost?<\/summary>\n            <p>There is no catalogue price, and it would be dishonest to display one. A line is a project: the number of stations, the dimensions, the process and the building change the amount enormously. The study starts by understanding your process routing, and the figure comes afterwards.<\/p>\n          <\/details>\n      <\/div>\n    <\/div>\n  <\/div>\n<\/section>\n\n\n<div class=\"mec-bande mec-bande--centre gb-element-35b76ee9\">\n<div class=\"gbp-section__inner\">\n<h2 class=\"gb-text gbp-section__headline gb-text-bbbf2d8d\">Describe your process routing to us<\/h2>\n\n\n<p class=\"gb-text gbp-section__text gb-text-9327a75a\">What you treat, in what order, at what rate, and in what building. That is what a line is designed from \u2014 not from a catalogue.<\/p>\n\n\n<div class=\"gb-element-3d6b08ed\">\n<a class=\"gb-text gbp-button--primary gb-text-f616f238\" href=\"\/en\/contact-us\/\">Request a study<\/a>\n\n\n<a class=\"gb-text gbp-button--secondary gb-text-d8b2e044\" href=\"\/en\/industrial-paint-booths\/\">See industrial booths<\/a>\n\n<\/div>\n\n<\/div>\n\n<\/div>\n\n<\/div>\n\n<script type=\"application\/ld+json\">\n{\n \"@context\": \"https:\/\/schema.org\",\n \"@type\": \"FAQPage\",\n \"mainEntity\": [\n  {\n   \"@type\": \"Question\",\n   \"name\": \"From what volume is a line worthwhile?\",\n   \"acceptedAnswer\": {\n    \"@type\": \"Answer\",\n    \"text\": \"There is no universal threshold, and be wary of anyone who gives you one. The real signal lies elsewhere: if your booth spends a large share of its time drying or waiting rather than painting, the capacity you have already paid for is tied up. It is this imbalance, not a number of parts, that makes a line pay off.\"\n   }\n  },\n  {\n   \"@type\": \"Question\",\n   \"name\": \"Does everything have to be automated?\",\n   \"acceptedAnswer\": {\n    \"@type\": \"Answer\",\n    \"text\": \"No, and it is rarely the right calculation. A line can be fully manual for application and automate only the transfer between stations \u2014 which already solves handling and waiting. Automating application is only justified on repetitive runs, where the movement is always the same.\"\n   }\n  },\n  {\n   \"@type\": \"Question\",\n   \"name\": \"Can a line be installed in an existing building?\",\n   \"acceptedAnswer\": {\n    \"@type\": \"Answer\",\n    \"text\": \"That is the most common case. The building survey therefore comes early in the study: available height, column spacing, position of the doors and supply connections. These constraints shape the line as much as the process does, and it is better to know them before drawing than to discover that a column falls in the middle of a compartment.\"\n   }\n  },\n  {\n   \"@type\": \"Question\",\n   \"name\": \"Can we start small and add to it later?\",\n   \"acceptedAnswer\": {\n    \"@type\": \"Answer\",\n    \"text\": \"Yes, provided it is planned from the study stage. Reserving the space for a future station, sizing the ventilation and supply connections for the complete line, and keeping access clear: this costs little at the start and avoids redoing everything. Adding a compartment to a line that did not plan for it often costs more than the complete original line.\"\n   }\n  },\n  {\n   \"@type\": \"Question\",\n   \"name\": \"Who handles the installation?\",\n   \"acceptedAnswer\": {\n    \"@type\": \"Answer\",\n    \"text\": \"Our teams. They install our equipment and also dismantle other manufacturers' installations, which is a good way to learn what ages badly. See the installation and dismantling page.\"\n   }\n  },\n  {\n   \"@type\": \"Question\",\n   \"name\": \"What does a line cost?\",\n   \"acceptedAnswer\": {\n    \"@type\": \"Answer\",\n    \"text\": \"There is no catalogue price, and it would be dishonest to display one. A line is a project: the number of stations, the dimensions, the process and the building change the amount enormously. The study starts by understanding your process routing, and the figure comes afterwards.\"\n   }\n  }\n ]\n}\n<\/script>\n","protected":false},"excerpt":{"rendered":"<p>Complete installations \u00b7 custom study Automated painting lines When one booth is no longer enough, it is the part that has to move along \u2014 not the operator running from one station to the next. Request a study See our projects \u2192Stations in sequence \u2713Design and manufacture Custom-built 100%Designed around your process 10+Years in business &#8230; <a title=\"Automated Painting Lines\" class=\"read-more\" href=\"https:\/\/www.mecatelier.com\/en\/automated-painting-lines\/\" aria-label=\"Read more about Automated Painting Lines\">Read more<\/a><\/p>\n","protected":false},"author":1,"featured_media":0,"parent":0,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"footnotes":""},"class_list":["post-1887","page","type-page","status-publish"],"_links":{"self":[{"href":"https:\/\/www.mecatelier.com\/en\/wp-json\/wp\/v2\/pages\/1887","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.mecatelier.com\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.mecatelier.com\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.mecatelier.com\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.mecatelier.com\/en\/wp-json\/wp\/v2\/comments?post=1887"}],"version-history":[{"count":7,"href":"https:\/\/www.mecatelier.com\/en\/wp-json\/wp\/v2\/pages\/1887\/revisions"}],"predecessor-version":[{"id":2100,"href":"https:\/\/www.mecatelier.com\/en\/wp-json\/wp\/v2\/pages\/1887\/revisions\/2100"}],"wp:attachment":[{"href":"https:\/\/www.mecatelier.com\/en\/wp-json\/wp\/v2\/media?parent=1887"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}