{"id":1905,"date":"2025-12-11T08:16:37","date_gmt":"2025-12-11T08:16:37","guid":{"rendered":"https:\/\/www.mecatelier.com\/paint-booth-for-industry\/"},"modified":"2026-11-10T19:44:08","modified_gmt":"2026-11-10T19:44:08","slug":"paint-booth-for-industry","status":"publish","type":"page","link":"https:\/\/www.mecatelier.com\/en\/paint-booth-for-industry\/","title":{"rendered":"Paint Booth for Industry"},"content":{"rendered":"\n<section class=\"mecv3-hero\" style=\"--mecv3-photo:url('\/wp-content\/uploads\/2026\/08\/ligne-traitement-montage-mezzanine-scaled.jpg')\">\n  <img class=\"mecv3-hero-img\" src=\"\/wp-content\/uploads\/2026\/08\/ligne-traitement-montage-mezzanine-1024x399.jpg\" srcset=\"\/wp-content\/uploads\/2026\/08\/ligne-traitement-montage-mezzanine-scaled.jpg 2560w, \/wp-content\/uploads\/2026\/08\/ligne-traitement-montage-mezzanine-300x117.jpg 300w, \/wp-content\/uploads\/2026\/08\/ligne-traitement-montage-mezzanine-1024x399.jpg 1024w, \/wp-content\/uploads\/2026\/08\/ligne-traitement-montage-mezzanine-768x300.jpg 768w, \/wp-content\/uploads\/2026\/08\/ligne-traitement-montage-mezzanine-1536x599.jpg 1536w, \/wp-content\/uploads\/2026\/08\/ligne-traitement-montage-mezzanine-2048x799.jpg 2048w\" sizes=\"(max-width:980px) 100vw, 62vw\" alt=\"Mecatelier treatment line being installed: open curing oven showing a part inside, adjoining booth in white panels and steel mezzanine carrying the air handling units\" width=\"2560\" height=\"998\" fetchpriority=\"high\" decoding=\"async\"\/>\n  <div class=\"mecv3-hero-content\">\n    <div class=\"mecv3-copy\">\n      <div class=\"mecv3-eyebrow\">Industry \u00b7 complete installations<\/div>\n      <h1 class=\"mecv3-h1\">Paint booths and installations for industry<\/h1>\n      <p class=\"mecv3-lead\">Few industrial parts need just one coat of paint. The real issue is the sequence of treatments.<\/p>\n      <div class=\"mecv3-actions\">\n        <a class=\"mecv3-btn mecv3-btn--primary\" href=\"https:\/\/www.mecatelier.com\/en\/contact-us\/\">Request a study<\/a>\n        <a class=\"mecv3-btn mecv3-btn--secondary\" href=\"https:\/\/www.mecatelier.com\/en\/projects\/\">See our projects<\/a>\n      <\/div>\n      <div class=\"mecv3-badges\">\n        <span class=\"mecv3-badge\"><span class=\"mecv3-dot\">\u2192<\/span>Several treatments<\/span>\n        <span class=\"mecv3-badge\"><span class=\"mecv3-dot\">\u2713<\/span>Design and manufacture<\/span>\n        <span class=\"mecv3-badge\"><span class=\"mecv3-dot mecv3-dot--cle\"><svg viewbox=\"0 0 24 24\" fill=\"none\" stroke=\"currentColor\" stroke-width=\"1.9\" stroke-linecap=\"round\" stroke-linejoin=\"round\" aria-hidden=\"true\"><circle cx=\"7.5\" cy=\"12\" r=\"3.6\"><\/circle><path d=\"M11.1 12H21\"><\/path><path d=\"M17.6 12v3.1\"><\/path><path d=\"M20.4 12v2.2\"><\/path><\/svg><\/span>Custom-built<\/span>\n      <\/div>\n    <\/div>\n  <\/div>\n<\/section>\n\n<div class=\"mecv3-statsband\">\n  <div class=\"mecv3-statsband__inner\">\n    <div class=\"mecv3-stat\"><span class=\"mecv3-stat__ico\"><svg viewbox=\"0 0 24 24\" fill=\"none\" stroke=\"currentColor\" stroke-width=\"1.5\" stroke-linecap=\"round\" stroke-linejoin=\"round\" aria-hidden=\"true\"><circle cx=\"12\" cy=\"12\" r=\"8.2\"><\/circle><circle cx=\"12\" cy=\"12\" r=\"4.3\"><\/circle><circle cx=\"12\" cy=\"12\" r=\"1.1\"><\/circle><\/svg><\/span><span class=\"mecv3-stat__txt\"><span class=\"mecv3-num\">100%<\/span><span class=\"mecv3-lbl\">Designed around your process<\/span><\/span><\/div>\n    <div class=\"mecv3-stat\"><span class=\"mecv3-stat__ico\"><svg viewbox=\"0 0 24 24\" fill=\"none\" stroke=\"currentColor\" stroke-width=\"1.5\" stroke-linecap=\"round\" stroke-linejoin=\"round\" aria-hidden=\"true\"><path d=\"M3 21h18\"><\/path><path d=\"M5 21V11l5 3V11l5 3V7l4 2.5V21\"><\/path><path d=\"M8 17h1M13 17h1M18 17h1\"><\/path><\/svg><\/span><span class=\"mecv3-stat__txt\"><span class=\"mecv3-num\">360+<\/span><span class=\"mecv3-lbl\">Installations<\/span><\/span><\/div>\n    <div class=\"mecv3-stat\"><span class=\"mecv3-stat__ico\"><svg viewbox=\"0 0 24 24\" fill=\"none\" stroke=\"currentColor\" stroke-width=\"1.5\" stroke-linecap=\"round\" stroke-linejoin=\"round\" aria-hidden=\"true\"><circle cx=\"12\" cy=\"9\" r=\"5.2\"><\/circle><path d=\"M8.8 13.4L7.4 21l4.6-2.6L16.6 21l-1.4-7.6\"><\/path><\/svg><\/span><span class=\"mecv3-stat__txt\"><span class=\"mecv3-num\">10+<\/span><span class=\"mecv3-lbl\">Years in business<\/span><\/span><\/div>\n    <div class=\"mecv3-stat\"><span class=\"mecv3-stat__ico\"><svg viewbox=\"0 0 24 24\" fill=\"none\" stroke=\"currentColor\" stroke-width=\"1.5\" stroke-linecap=\"round\" stroke-linejoin=\"round\" aria-hidden=\"true\"><path d=\"M3 21V9.5l5.5-3.5V21\"><\/path><path d=\"M8.5 21V12l6-3v12\"><\/path><path d=\"M14.5 21V11l6 3.2V21\"><\/path><path d=\"M2 21h20\"><\/path><\/svg><\/span><span class=\"mecv3-stat__txt\"><span class=\"mecv3-num\">7+<\/span><span class=\"mecv3-lbl\">Countries served<\/span><\/span><\/div>\n  <\/div>\n<\/div>\n\n<div class=\"mec-2026\">\n<div class=\"mec-bande gb-element-afeee419\">\n<div class=\"gbp-section__inner\">\n<div class=\"gb-element-9bf9812d\">\n<div>\n<p class=\"gb-text gbp-section__text gb-text-2342dacc\">In a body shop, the booth is the central station and everything is organised around it. In industry, that&#8217;s rarely the case: painting is <strong>one step among several<\/strong>, and it&#8217;s the sequence that determines the quality of the result as much as the application itself.<\/p>\n\n\n<p class=\"gb-text gbp-section__text gb-text-1d606b57\">A part may need to be degreased, stripped, dried, primed, painted, then cured. Each step has its own requirements for air, temperature and cleanliness, and they aren&#8217;t compatible with each other. Making them share the same enclosure means accepting that each one is done badly.<\/p>\n\n\n<div class=\"gb-element-9e2783a3\">\n<a class=\"gb-text gbp-button--primary gb-text-0a02310a\" href=\"\/en\/contact-us\/\">Request a study<\/a>\n\n\n<a class=\"gb-text gbp-button--secondary gb-text-2f09fd82\" href=\"\/en\/contact-us\/\">Contact us<\/a>\n\n<\/div>\n\n<\/div>\n\n<\/div>\n\n<\/div>\n\n<\/div>\n\n\n<section class=\"mecp-sec\">\n  <div class=\"mecp-sec__in\">\n    <div class=\"mecp-sec__grid\">\n      <div class=\"mecp-sec__aside\">\n      <span class=\"mecp-sec__num\">01<\/span>\n      <h2>The process shapes the installation<\/h2>\n      <p class=\"mecp-verdict\">We don&#8217;t start from a catalogue of enclosures to see which one might suit you. We start from your process sequence, and the installation is its translation.<\/p>\n      <\/div>\n      <div>\n        <div class=\"mecp-prose\">\n          <p>In practice, that means asking the questions in this order: what the part goes through, in what order, with what waiting times between steps, and at what throughput. Dimensions and equipment come afterwards \u2014 never before.<\/p>\n        <\/div>\n        <div class=\"mecp-benefits\">\n          <div class=\"mecp-ben\">\n            <h3>One step, one enclosure<\/h3>\n            <p>when requirements are incompatible, mixing them means doing both badly<\/p>\n          <\/div>\n          <div class=\"mecp-ben\">\n            <h3>One enclosure, several steps<\/h3>\n            <p>when throughput allows, it&#8217;s more compact and much cheaper. A booth that applies and then cures avoids a second enclosure and a transfer<\/p>\n          <\/div>\n          <div class=\"mecp-ben\">\n            <h3>Transfers matter as much as the stations<\/h3>\n            <p>that&#8217;s often where time is lost, and where a freshly treated part gets marked<\/p>\n          <\/div>\n        <\/div>\n      <\/div>\n    <\/div>\n  <\/div>\n<\/section>\n\n\n<div class=\"mecp-gal\">\n  <figure class=\"mecp-gal__big\">\n    <img src=\"\/wp-content\/uploads\/2026\/08\/ligne-traitement-montage-mezzanine-scaled.jpg\" alt=\"Mecatelier treatment line being installed: open curing oven showing a part inside, adjoining booth in white panels and steel mezzanine carrying the air handling units above the line\" loading=\"lazy\" decoding=\"async\"\/>\n    <figcaption>An installation being assembled: the curing oven is open on a part, the booth is adjoining, and the air handling units are on the mezzanine \u2014 not on the floor.<\/figcaption>\n  <\/figure>\n  <div class=\"mecp-gal__col\">\n    <figure>\n      <img src=\"\/wp-content\/uploads\/2026\/08\/ligne-traitement-compartiments-mecatelier-scaled.jpg\" alt=\"Inside a Mecatelier treatment line: grating floor, vertical lighting columns marked Ex, yellow covers on the floor and sectional door open onto the next compartment\" loading=\"lazy\" decoding=\"async\"\/>\n      <figcaption>The same logic, finished: successive compartments, separated by doors, each with its own atmosphere and controls.<\/figcaption>\n    <\/figure>\n  <\/div>\n<\/div>\n\n\n<section class=\"mecp-sec mecp-sec--tint\">\n  <div class=\"mecp-sec__in\">\n    <div class=\"mecp-sec__grid\">\n      <div class=\"mecp-sec__aside\">\n      <span class=\"mecp-sec__num\">02<\/span>\n      <h2>A booth, or an installation?<\/h2>\n      <p class=\"mecp-verdict\">The answer comes down to a single criterion, and it isn&#8217;t budget: the number of times the part has to change state.<\/p>\n      <\/div>\n      <div>\n        <div class=\"mecp-prose\">\n          <p>If you apply a product and leave it to dry, an <strong>industrial booth<\/strong> is enough, and it&#8217;s the most economical solution both to buy and to run.<\/p>\n          <p>If the part goes through several successive treatments, a booth on its own will force you to improvise the other steps elsewhere in the workshop \u2014 in other words, to make do, without capture or control. That&#8217;s where an <strong>installation<\/strong> is justified.<\/p>\n        <\/div>\n        <div class=\"mecp-sec__actions\">\n          <a class=\"mecv3-btn mecv3-btn--secondary\" href=\"\/en\/industrial-paint-booths\/\">See industrial booths<\/a>\n          <a class=\"mecv3-btn mecv3-btn--secondary\" href=\"\/en\/automated-painting-lines\/\">See automated lines<\/a>\n        <\/div>\n      <\/div>\n    <\/div>\n  <\/div>\n<\/section>\n\n\n<section class=\"mecp-sec mecp-sec--tint\">\n  <div class=\"mecp-sec__in\">\n    <div class=\"mecp-sec__grid\">\n      <div class=\"mecp-sec__aside\">\n      <span class=\"mecp-sec__num\">FAQ<\/span>\n      <h2>Frequently asked questions<\/h2>\n      <p class=\"mecp-verdict\">What we are asked about industrial installations.<\/p>\n      <\/div>\n      <div>\n          <details class=\"mecp-faq\" open=\"\">\n            <summary>How is this different from your industrial booths?<\/summary>\n            <p>An industrial booth is a single station: it applies and dries, sized to your parts. This page covers what happens when a single enclosure is no longer enough, because the part has to undergo several treatments. If your need fits in one station, the industrial booths page is the right one.<\/p>\n          <\/details>\n          <details class=\"mecp-faq\">\n            <summary>Can liquid paint and powder coating be combined?<\/summary>\n            <p>Yes, and it&#8217;s common. The two processes need different enclosures \u2014 powder needs recovery and curing at temperature, liquid needs filtration and extraction \u2014 but they coexist well in the same installation, each with its own station. Several of our projects do this.<\/p>\n          <\/details>\n          <details class=\"mecp-faq\">\n            <summary>Does everything have to be installed at once?<\/summary>\n            <p>No, provided it&#8217;s planned for. Reserving the space for a future station, sizing the ventilation and supplies for the complete installation, and keeping access clear: this costs little at the outset and avoids redoing everything. Adding a station to an installation that made no provision for it often costs more than the complete original installation would have.<\/p>\n          <\/details>\n          <details class=\"mecp-faq\">\n            <summary>Do you work on existing installations?<\/summary>\n            <p>Yes, including ones we didn&#8217;t build. Adding an enclosure, upgrading ventilation that has become insufficient or replacing an ageing station is part of what we do. A preliminary audit establishes what can be kept \u2014 often more than you&#8217;d think.<\/p>\n          <\/details>\n          <details class=\"mecp-faq\">\n            <summary>Where are the installations built?<\/summary>\n            <p>In our own workshop. The enclosures, walls, doors, ventilation and control cabinets all come out of it. That&#8217;s what allows us to design a station to the exact dimensions of your parts, and to remake a spare part ten years later instead of hunting for it at a supplier who has changed its range.<\/p>\n          <\/details>\n      <\/div>\n    <\/div>\n  <\/div>\n<\/section>\n\n\n<div class=\"mec-bande mec-bande--centre gb-element-9b4ee323\">\n<div class=\"gbp-section__inner\">\n<h2 class=\"gb-text gbp-section__headline gb-text-bbbf2d8d\">Tell us about your process sequence<\/h2>\n\n\n<p class=\"gb-text gbp-section__text gb-text-7d9064d3\">What the part goes through, in what order, and at what throughput. That&#8217;s where the study starts \u2014 and it&#8217;s what will tell whether you need a booth or an installation.<\/p>\n\n\n<div class=\"gb-element-e09d8fe3\">\n<a class=\"gb-text gbp-button--primary gb-text-f616f238\" href=\"\/en\/contact-us\/\">Request a study<\/a>\n\n\n<a class=\"gb-text gbp-button--secondary gb-text-d8b2e044\" href=\"\/en\/industrial-paint-booths\/\">See industrial booths<\/a>\n\n\n<a class=\"gb-text gbp-button--secondary gb-text-65b65492\" href=\"\/en\/retractable-paint-booths\/\">See retractable booths<\/a>\n\n<\/div>\n\n<\/div>\n\n<\/div>\n\n<\/div>\n\n<script type=\"application\/ld+json\">\n{\n \"@context\": \"https:\/\/schema.org\",\n \"@type\": \"FAQPage\",\n \"mainEntity\": [\n  {\n   \"@type\": \"Question\",\n   \"name\": \"How is this different from your industrial booths?\",\n   \"acceptedAnswer\": {\n    \"@type\": \"Answer\",\n    \"text\": \"An industrial booth is a single station: it applies and dries, sized to your parts. This page covers what happens when a single enclosure is no longer enough, because the part has to undergo several treatments. If your need fits in one station, the industrial booths page is the right one.\"\n   }\n  },\n  {\n   \"@type\": \"Question\",\n   \"name\": \"Can liquid paint and powder coating be combined?\",\n   \"acceptedAnswer\": {\n    \"@type\": \"Answer\",\n    \"text\": \"Yes, and it's common. The two processes need different enclosures \u2014 powder needs recovery and curing at temperature, liquid needs filtration and extraction \u2014 but they coexist well in the same installation, each with its own station. Several of our projects do this.\"\n   }\n  },\n  {\n   \"@type\": \"Question\",\n   \"name\": \"Does everything have to be installed at once?\",\n   \"acceptedAnswer\": {\n    \"@type\": \"Answer\",\n    \"text\": \"No, provided it's planned for. Reserving the space for a future station, sizing the ventilation and supplies for the complete installation, and keeping access clear: this costs little at the outset and avoids redoing everything. Adding a station to an installation that made no provision for it often costs more than the complete original installation would have.\"\n   }\n  },\n  {\n   \"@type\": \"Question\",\n   \"name\": \"Do you work on existing installations?\",\n   \"acceptedAnswer\": {\n    \"@type\": \"Answer\",\n    \"text\": \"Yes, including ones we didn't build. Adding an enclosure, upgrading ventilation that has become insufficient or replacing an ageing station is part of what we do. A preliminary audit establishes what can be kept \u2014 often more than you'd think.\"\n   }\n  },\n  {\n   \"@type\": \"Question\",\n   \"name\": \"Where are the installations built?\",\n   \"acceptedAnswer\": {\n    \"@type\": \"Answer\",\n    \"text\": \"In our own workshop. The enclosures, walls, doors, ventilation and control cabinets all come out of it. That's what allows us to design a station to the exact dimensions of your parts, and to remake a spare part ten years later instead of hunting for it at a supplier who has changed its range.\"\n   }\n  }\n ]\n}\n<\/script>\n","protected":false},"excerpt":{"rendered":"<p>Industry \u00b7 complete installations Paint booths and installations for industry Few industrial parts need just one coat of paint. The real issue is the sequence of treatments. Request a study See our projects \u2192Several treatments \u2713Design and manufacture Custom-built 100%Designed around your process 360+Installations 10+Years in business 7+Countries served In a body shop, the booth &#8230; <a title=\"Paint Booth for Industry\" class=\"read-more\" href=\"https:\/\/www.mecatelier.com\/en\/paint-booth-for-industry\/\" aria-label=\"Read more about Paint Booth for Industry\">Read more<\/a><\/p>\n","protected":false},"author":1,"featured_media":0,"parent":0,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"footnotes":""},"class_list":["post-1905","page","type-page","status-publish"],"_links":{"self":[{"href":"https:\/\/www.mecatelier.com\/en\/wp-json\/wp\/v2\/pages\/1905","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.mecatelier.com\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.mecatelier.com\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.mecatelier.com\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.mecatelier.com\/en\/wp-json\/wp\/v2\/comments?post=1905"}],"version-history":[{"count":7,"href":"https:\/\/www.mecatelier.com\/en\/wp-json\/wp\/v2\/pages\/1905\/revisions"}],"predecessor-version":[{"id":2093,"href":"https:\/\/www.mecatelier.com\/en\/wp-json\/wp\/v2\/pages\/1905\/revisions\/2093"}],"wp:attachment":[{"href":"https:\/\/www.mecatelier.com\/en\/wp-json\/wp\/v2\/media?parent=1905"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}